PORT OF TRIESTE Rizzo Sud Breakwater
Task
Port of Trieste – Static consolidation intervention of the Rizzo Sud Breakwater
Strategy
Detail design, Safety Coordination during design Phase
Design
PROJECT MANAGEMENT, DESIGN
Client
Autorità di Sistema Portuale Mar Adriatico Orientale
Project Director
Ing. Michelangelo Lentini
Budget
€ 4,997,737.10
Completion Date
June 10th, 2020 - October 1st, 2023
Associated Consultants
Progettista OOMM e CSP Ing. A. PORRETTI Geol. Carlo Alberto MASOLI
Tags
SHELTER HARBOUR AT THE 'LUIGI RIZZO SUD’ BREAKWATER
The aim of the project was to restore the work to its original integrity, respecting its historical identity.
The design and modelling phases were anticipated by a careful study of the geomorphological conditions of the site where the infrastructure in subject is located and its state of conservation.
After the data acquisition, according to the BIM methodology, the actual state was reconstructed both from a geometric and constructive point of view. Indeed, all the elements of the breakwater have been modelled (artificial boulders, perimetral paving elements of wall face and original paving blocks) respecting the real configuration and the quality of the materials, highlighting all the degraded parts.

Image 6
Image 6

image 2 3d
image 2 3d

image 1
image 1

image 7
image 7
SERVICES DELIVERED
Among the forecast interventions, the following are reported:
- anchorage of the perimetral paving elements to the breakwater body by means of galvanised and concrete-embedded steel bars;
- consolidation of the sea-side face by means of core drilling and insertion of steel bars and mortar;
- consolidation of the submerged boulders, both seaside and harbour side, by stitching the whole head;
- horizontal nailing of the damaged portions of the boulders;
- removal and restoration of the original paving blocks dislodged, including the substrate;
- restoration of bollards and fendering;
- restoration of crumbling and reef resurfacing on the North Head
- No. 4 breasting dolphins equipped with mooring bollards and fenders;
- No. 2 mooring dolphin equipped with 100-tonne bollards;
- No. 1 staff landing platform equipped with fender.