PORT OF TRIESTE MOLO VII

Task

Trieste Port, Italy Terminal Container. Elongation of Dock n° 7 – 100 mt”

  • Strategy

    Preliminary design, Detail Design, EiA, Plan of investigation, Site supervision of investigation, Technical-Functional Adjustment (ATF) of the current Port Master Plan Port Planning Design

  • Design

    Project Management, Design

  • Client

    TMT spa Punto Franco Nuovo 34123 Trieste

  • Chief Project Manager Site Supersor

    Ing. Michelangelo Lentini

  • Budget

    € 75,140,000.00

  • Completion Date

    September 24th, 2014 - February 2nd, 2015

  • Tags

    Design, Project Management

The Challenge

CONTAINER TERMINAL MOLO VII – 100 m EXTENSION

The project consists of the extension of the Molo VII – 100 m to allow the simultaneous approach of 2 ultra large container vessels.

The project includes:

  1. 100 m extension of the dock by repeating the existing structural model;
  2. Refurbishment of 300 m of the existing crane railways along the quay;
  3. Installation of new fenders and bollards suitably sized to guarantee the safe mooring of the designed vessel even in unfavorable wind conditions;
  4. Requalification and rearrangement of the yard, included electrical, lighting and fire protection networks;
  5. Refurbishment of the existing facilities and realization of a stormwater drainage and treatment system.
The Goal

THE CORE OF THE PROJECT

A further extension up to 800 m is envisaged by the port Master Plan.

The south quay will be equipped with eight quay cranes, included new ‘24 rows’ StS.

The requalification purpose yard is to rationalize the container storage, in anticipation of the expected increase of the traffic volume.

This project has been drawn up in BIM: 2D/3D views, elevations and sections have been set. The BIM model has been realized for each structural element, for example piles, beams and slabs, and thanks to it, every conflict with the internal plants, for example electrical or firefighting system, has been individuated and solved by the work team in each section.