Industrial Construction March 25, 2021

PORT OF TARANTO: SAN CATALDO CONTAINER TERMINAL YILPORT

Task

San Cataldo Container Terminal - UPGRADING AND REFURBISHMENT OF THE BUILDINGS (Office Buildings, Gate, OPS Station, refurbishment of the workshop) of the SCCT SPA container terminal at Molo Polisettoriale

  • Strategy

    For Construction design

  • Design

    Epc Activities, Design

  • Client

    SCCT spa S.S. 106 Ionica Molo Polisettoriale 74123 Taranto

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,597,080.56

  • Completion Date

    March 25th, 2021 - February 9th, 2024

  • Tags

    Design, EPC Activities

The Challenge

A NEW VISION

The San Cataldo Container Terminal (SCCT), concessionaire of the areas and quay of the Molo Polisettoriale in Taranto, has started the activities of requalification and normative adaptation to allow the operativity of the existing infrastructures and plants. To this purpose, it has defined detailed technical specifications in order to make the buildings operational and has assigned to SJS s.r.l., as General Contractor (EPC FIDIC contract), the design and works execution of refurbishment works related to the buildings listed below.

The Goal

SERVICES DELIVERED

  1. Section 1: ‘Temporary Gate Building’;
  2. Section 2: Building 1 (Ground Floor and Roof Floor)’;
  3. Section 3: ‘Building 1 (First Floor)’;
  4. Section 4: ‘Workshop building (part of it)’;
  5. Section 5: ‘Building 2 (Ground Floor only)’;
  6. Section 6: ‘ OPS Building’.

The interventions included in the project are the following:

  1. Refurbishment works, excluding structural works;
  2. Functionality checks of the existing technological systems, restoration, integration and replacement of parts of the system to integrate or maintain the efficiency of the existing technological systems.

During the construction works have been executed surveys using SAPR Equipment. The SJS APR pilot has a patent issued by ENAC in accordance with European regulations EASA and can carry out overflights in the presence of people, on urban residential areas and on sensitive infrastructure (highways, power plants, railway lines, etc.).

The construction works have been carried out by the company S.J.S. BUILDINGS s.r.l.