PORT OF TARANTO MOLO POLISETTORIALE: CONTROL TOWER
Task
Control Tower of the Container Terminal - Molo Polsiettoriale Port of Taranto.
Strategy
Site supervision, Safety Coordination during construction Phase
Design
Preliminary design, Detail design, For construction design, Site Supervision
Client
T.C.T. spa - Molo Polisettoriale - 74100 Taranto
Chief Project Manager and Site Supervisor
Ing. Michelangelo Lentini
Budget
€ 945,116.12
Completion Date
October 1st, 2000 - April 20th, 2001
Tags
CONTAINER TERMINAL – MOLO POLISETTORIALE
The Project has included: Rehabilitation and rejuvenation of mooring berths and yard; Medium and low voltage power network; Medium and low-voltage secondary power network; Construction of port railroad with connection to the Taranto-Metaponto railway line; Construction of New Gate and Customs Area fencing; Facilities for hazardous goods storage and truck wash areas; CCTVC for storage yard; Water purification plant; Reconstruction of the access channel; Container Terminal Control Tower; 3 office and service buildings (reconstruction); 2 Warehouses; Repair Shop; Port station; Border Inspection Agency premises (reconstruction).

Occhio di pesce
Occhio di pesce

torre 13
torre 13

TCT Torre Controllo prospetto
TCT Torre Controllo prospetto

TCT Torre Controllo night2
TCT Torre Controllo night2
SERVICES DELIVERED
- Rehabilitation and rejuvenation of mooring berths and yard;
- Medium and low voltage power network;
- Medium and low-voltage secondary power network;
- Construction of port railroad with connection to the Taranto-Metaponto railway line;
- Construction of New Gate and Customs Area fencing;
- Facilities for hazardous goods storage and truck wash areas;
- CCTVC for storage yard; Water purification plant;
- Reconstruction of the access channel; Container Terminal Control Tower;
- 3 office and service buildings (reconstruction);
- 2 Warehouses;
- Repair Shop; Port station; Border Inspection Agency premises (reconstruction).