Industrial Construction October 1, 2000

PORT OF TARANTO MOLO POLISETTORIALE: CONTROL TOWER

Task

Control Tower of the Container Terminal - Molo Polsiettoriale Port of Taranto.

  • Strategy

    Site supervision, Safety Coordination during construction Phase

  • Design

    Preliminary design, Detail design, For construction design, Site Supervision

  • Client

    T.C.T. spa - Molo Polisettoriale - 74100 Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 945,116.12

  • Completion Date

    October 1st, 2000 - April 20th, 2001

  • Tags

    Design, EPC Activities

The Challenge

CONTAINER TERMINAL – MOLO POLISETTORIALE

The Project has included: Rehabilitation and rejuvenation of mooring berths and yard; Medium and low voltage power network; Medium and low-voltage secondary power network; Construction of port railroad with connection to the Taranto-Metaponto railway line; Construction of New Gate and Customs Area fencing; Facilities for hazardous goods storage and truck wash areas; CCTVC for storage yard; Water purification plant; Reconstruction of the access channel; Container Terminal Control Tower; 3 office and service buildings (reconstruction); 2 Warehouses; Repair Shop; Port station; Border Inspection Agency premises (reconstruction).

The Goal

SERVICES DELIVERED

  1. Rehabilitation and rejuvenation of mooring berths and yard;
  2. Medium and low voltage power network;
  3. Medium and low-voltage secondary power network;
  4. Construction of port railroad with connection to the Taranto-Metaponto railway line;
  5. Construction of New Gate and Customs Area fencing;
  6. Facilities for hazardous goods storage and truck wash areas;
  7. CCTVC for storage yard; Water purification plant;
  8. Reconstruction of the access channel; Container Terminal Control Tower;
  9. 3 office and service buildings (reconstruction);
  10. 2 Warehouses;
  11. Repair Shop; Port station; Border  Inspection Agency premises (reconstruction).