PORT OF OLBIA INTEGRATED SAFETY SYSTEM IN THE PORT AREAS

Task

Integrated Safety System in the port areas of “Pontile Isola Bianca” in Olbia,”Porto Cocciani” in Olbia and “Golfo Aranci Trade Port”

  • Strategy

    Preliminary Design, Detail design, For construction design, Safety Coordination during the design stage

  • Design

    Design

  • Client

    Autorità Portuale di Olbia e Golfo Aranci

  • Chief Project Manager, HSE manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,977,978.32

  • Completion Date

    December 1st, 2007 - December 31st, 2007

  • Tags

    Design

The Challenge

THE PROJECT

Integrated Safety System in the port areas of “Pontile Isola Bianca” in Olbia,”Porto Cocciani” in Olbia and “Golfo Aranci Trade Port”.

The Port of Olbia, divided into the three areas listed above, is well connected to the road axes, with accesses allowed by 3 driveways and one for pedestrian.

The Goal

SERVICES DELIVERED

The project has involved the realization of a protected area by controlling unauthorized access from both land and sea.

The project has therefore guaranteed:

  1. Single station location for monitoring signals from IDS (Intrusion Detection System);
  2. Supervision of all access to port areas;
  3. Adequate surveillance measures for the water surface of the port;
  4. Physical barriers to delimit the protected port area.