Infrastructure and Maritime Works October 16, 2020
PORT OF MARINA DI CARRARA MOORING DOLPHIN
Task
Port of Marina di Carrara, Italy NEW MOORING DOLPHIN FOR A LARGE CRUISE SHIP
Strategy
Safety Coordination during construction works
Design
Work Management
Client
Autorità di Sistema Portuale Mar Ligure Orientale Via del Molo n. 1 19126 La Spezia
HSE Manager
Ing. Michelangelo Lentini
Budget
€ 358,861.33
Completion Date
October 16th, 2020- November 3rd, 2021
Tags
The Challenge
The operations to extend the Taliercio Quay and the ‘verticalization’ of the quay head are configured as infrastructural adjustment interventions, both aimed at improving the usability of the port and the coexistence of commercial and cruise traffic already in place.

IMGP5919
IMGP5919

IMGP5923
IMGP5923

IMGP5889
IMGP5889

IMGP5890
IMGP5890

IMGP5892
IMGP5892

IMGP5895
IMGP5895

IMGP5916
IMGP5916

IMGP6178
IMGP6178

IMGP6182
IMGP6182

IMGP6196
IMGP6196

IMGP6199
IMGP6199

IMGP6225
IMGP6225

IMGP6219
IMGP6219
The Goal
Services delivered
The project includes the following interventions:
- The Taliercio Quay extension, with the aim of creating new berths and yard spaces in order to guarantee correct port operations even in the case of simultaneous presence of cruise ships and bulk carrier units;
- The reconfiguration of the vertical profile of the quay services head to guarantee the necessary spaces for the manoeuvring in entry and exit from the port, in safe conditions, of the design vessel;
- The installation of a breasting dolphin at a distance of about 60 m from the current limit of the Taliercio Quay for the safe mooring of cruise ships.



Project Breakdown