PORT OF GIOIA TAURO WESTERN QUAY

Task

Port of Gioia Tauro (RC) Italy. Completion of the western quay on the north side

  • Strategy

    Site supervision, Safety Coordination during construction Phase

  • Design

    Infrastructure and maritime works, work management

  • Client

    Autorità di Sistema Portuale dei Mari Tirreno Meridionale e Ionio

  • Site Manager and HSE Manager

    Eng. Michelangelo Lentini

  • Budget

    € 16.579.246,90

  • Completion Date

    March 25th, 2021 - February 9th, 2024

The Challenge

Extensive redevelopment and a new challenge

The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m and includes the following interventions:

  • main straight section of about 325 m that joins the ‘F’ section quay to the north and the ‘G’ section quay to the south
  • a section of approximately 60 m, built over the existing ‘G’ quay;
  • closing flap at right angles to the section of quay ‘G’;
  • forecourt behind the quay, the finishing package of which consists of a layer of stabilized material at least 40 cm thick, a 17 cm thick base layer, a 10 cm thick binder course and a 3 cm thick layer of SPLIT-MASTIX anti-skid asphalt;
  • laying of channels for future plants;
  • rainwater collection network including 2 oil separators;
  • installation of quay fittings (bollards, fenders and stainless-steel ladders).
Before After
The Goal

REVITALIZATION OF THE GIOIA TAURO PORT WESTERN QUAY

The project, spearheaded by the distinguished engineer Michelangelo Lentini, focuses on the extensive redevelopment of the Western Quay at the Port of Gioia Tauro. This transformative initiative is set to elevate the port’s infrastructure, enhancing its capacity, efficiency, and competitiveness on the global stage.

Project Breakdown

Infrastructures and a collaborative environment

Lentini’s profound engineering expertise and strategic vision are central to the creation of modern facilities, including upgraded access roads, advanced cargo handling systems, and expanded docking areas.

The project aims to streamline port operations, reduce turnaround times, and accommodate larger vessels, positioning Gioia Tauro as a premier maritime gateway. Incorporating cutting-edge technology and sustainable practices, such as renewable energy systems and eco-friendly construction materials, this development underscores a strong commitment to environmental sustainability and operational excellence.

Back