Get In Touch
Taranto, Piazza Castel Sant’Angelo, N.6, 74123
sjs@sjs.it
Ph: (+39) 099 221 7800
Work Inquiries
sjs@sjs.it
Ph: (+39) 099 221 7800

PORT OF COSTANZA, ROMANIA

Task

Constanța (Romania) – Reduction of coastal erosion of the coastline of the city of Constanta

  • Strategy

    Design review & Audit, Site Supervision Services

  • Design

    Work Management

  • Client

    Administratia Bazinala de Apa Dobrogea Litoral Romania

  • Engineer

    Ing. Michelangelo Lentini

  • Associated Consultants

    Development in partnership with EPMC

  • Budget

    € 30.213.935,21

  • Completion Date

    December 3rd, 2019 - ongoing

  • Tags

    Work Management

The Challenge

REDUCTION OF COASTAL EROSION OF THE COASTLINE OF THE CITY OF CONSTANȚA

The Romanian coast along the Black Sea is subject to erosion processes that not only cause the loss of particularly valuable land but also affect coastal ecosystems, creating economic and social damage to the entire area.

The Administratia Bazinala de Apa Dobrogea Litoral (Dobrogea Seaside Water Basin Administration), linked to the Romanian Waters National Administration (RWNA), has therefore developed the Masterplan ‘Protection and Restoration of the Coastal Area’ to contain these processes.

Within the Reduction of Coastal Erosion Phase II (2014-2020) the area of intervention was divided into 11 lots, for a total development of over 30 km of coastline.

The Goal

REDUCTION OF COASTAL EROSION OF THE COASTLINE OF CONSTANȚA - PHASE II (2014 - 2020)

The aim of this intervention is to protect and restore the coastal area of the city of Constanța and its environmental components, by means of engineering works that contrast the erosion process, supporting the relaunch of the marine ecosystem and the reintegration of some species lost by the ecosystem, and protecting marine biodiversity and the coastline.

The project is financially supported by the European Union Cohesion Fund – Large Infrastructure Operational Program (LIOP) 2014-2020.

JV EPMC and S.J.S. Engineering is involved in the Project Management of the project (Resident Engineer, Yellow FIDIC Contract) and provides technical support to the Client in the supervision of the design phases for each of the 11 lots of the intervention.

Back

Leave a Reply

Your email address will not be published. Required fields are marked *

This website stores cookies on your computer. Cookie Policy