PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE
Task
Port of Civitavecchia, Italy Large Tanker Dock “DARSENA ENERGETICA GRANDI MASSE
Strategy
Detail design, Safety Coordination during design phase
Design
Project Management, Design
Client
Compagnia Porto di Civitavecchia s.p.a., Roma (Italy)
Team Leader and Chief Project Manager
Ing. Michelangelo Lentini
Budget
€ 235,261,195.07
Completion Date
August 1st, 2008 - March 9th, 2009
Tags
DARSENA ENERGETICA GRANDI MASSE
The project has provided, at the beginning, seabed dredging in order to allow the correct maneuvering of vessels both during access and berthing phases.
The related muds will be confined for the construction of a new quay (length 865 m) and the operational yard (total area 370,000 sqm) whereas a container terminal will be built on the reclamation area.
It was also planned the construction of the new Multi-Purpose Dock (365 m) as well as the construction of the main breakwater (845 m) equipped with liquid bulk handling facilities. The liquid bulk terminal is composed of three mooring berths: two for 50,000 DWT vessels and one for 100,000 DWT vessels.
The engineering services included also the study of the interferences between the dock and the Torrevaldaliga South Thermal Electric Plant cooling circuit.

image 2
image 2

image 4
image 4

image 5
image 5

image 6
image 6
SERVICES DELIVERED
The engineering services included also the study of the interferences between the dock and the Torrevaldaliga South Thermal Electric Plant cooling circuit.