PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE

Task

Port of Civitavecchia, Italy Large Tanker Dock “DARSENA ENERGETICA GRANDI MASSE

  • Strategy

    Detail design, Safety Coordination during design phase

  • Design

    Project Management, Design

  • Client

    Compagnia Porto di Civitavecchia s.p.a., Roma (Italy)

  • Team Leader and Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 235,261,195.07

  • Completion Date

    August 1st, 2008 - March 9th, 2009

  • Tags

    Design, Project Management

The Challenge

DARSENA ENERGETICA GRANDI MASSE

The project has provided, at the beginning, seabed dredging in order to allow the correct maneuvering of vessels both during access and berthing phases.

The related muds will be confined for the construction of a new quay (length 865 m) and the operational yard (total area 370,000 sqm) whereas a container terminal will be built on the reclamation area.

It was also planned the construction of the new Multi-Purpose Dock (365 m) as well as the construction of the main breakwater (845 m) equipped with liquid bulk handling facilities. The liquid bulk terminal is composed of three mooring berths: two for 50,000 DWT vessels and one for 100,000 DWT vessels.

The engineering services included also the study of the interferences between the dock and the Torrevaldaliga South Thermal Electric Plant cooling circuit.

The Goal

SERVICES DELIVERED

The engineering services included also the study of the interferences between the dock and the Torrevaldaliga South Thermal Electric Plant cooling circuit.