PORSCHE CENTER NARDO’ LECCE

Task

Porsche Center ""Nardò Technical center"", Nardò (Lecce( New construcion of workshop 72 and 74 with EV charging park 73 in the

  • Strategy

    Pre-construction design

  • Design

    Industrial Construction, Design

  • Client

    STRABAG

  • Project Coordinator

    Ing. Michelangelo Lentini

  • Budget

    € 26,000,000.00

  • Completion Date

    July 21st, 2021 - December 31st, 2021

  • Tags

    Design

The Challenge

PORSCHE CENTER NARD0’ NEW WORKSHOPS

The Nardò Technical Centre is a centre for the development and testing of prototype vehicles, consisting of more than 20 tracks, one of which is a 12-km loop, and about 40 workshops.

Of some of these, the demolition and reconstruction project was drawn up with an adjacent covered area for recharging electric cars. The construction design covered all sectors such as architecture, structure and plant engineering. For the architecture, the constraints imposed by the environmental and landscape context were respected, which therefore guided the design in the geometries and choice of materials.

For the interiors, on the other hand, the design followed the indications provided by the client regarding the distributions on the various levels, equipment and services to be guaranteed to the car manufacturers during testing activities.

The Goal

SERVICES DELIVERED

20 workshops were designed with, on the ground floor, all the necessary equipment to carry out tests of all kinds, then connected on the first floor to independent office and leisure areas and, on the second floor, to several meeting rooms. The structural part, once the geotechnical characteristics of the soil were verified, was also designed in accordance with these indications.

All workshops were equipped with a whole series of state-of-the-art devices and machinery; at least two car lifters, compressed air systems, high-performance electrical and special systems, etc. were installed in each workshop.

The construction design therefore covered: demolition of the existing workshops; internal and external renovation of the buildings to create 20 new workshops of the highest quality; redevelopment of the external areas, including those for the shelter and electric recharging of at least 7 cars.