METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

Task

meteoric water drainage system upgrading works and new discharge manifold for discharge waters in the Molo Polisettoriale Container Terminal

  • Strategy

    Site supervision and Safety Coordination during construction works

  • Design

    Epc Activities, Design

  • Client

    T.C.T. spa - Scali Cerere n. 9 57122 LIVORNO

  • Site supervisori and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 173,635.19

  • Completion Date

    February 1st, 2013 - December 1st, 2014

  • Tags

    Design, Project Management

The Challenge

WHAT WE ACCOMPLISHED

– Taranto Lot 1: urgent works: closure of the inner breakwater excessive discharge terminals and construction of a temporary collection basin Lot 2.1: urgent works: splitting of the basins leaching on the berthing quay, including the construction of two diaphragms to be installed on discharge terminals S4 and S5 and construction of a curb on the inner breakwater Lot 2.2: – finishing works: meteoric water collection network and splitting of the discharge water manifold.