Healthcare Building December 1, 2004

GIANNUZZI HOSPITAL IN MANDURIA (TARANTO)

Task

Renovation and adaptation of structures and technologies to regulations regarding safety and health in the workplace Adaptation and completion of the structure and systems related to the ""118"" Emergency and Urgency Adaptation of the ""Giannuzzi"" Hospital to standards and regulations

  • Strategy

    Preliminary design, Detail design, For Construction design, Safety Coordination during design phase, Site Supervision

  • Design

    Design, Work Management

  • Client

    ASL-TA/1 - Viale Virgilio, 31 - 74100 Taranto

  • Chief Project Manager and Site Supervisor, HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 4,890,621.85

  • Completion Date

    December 1st, 2004 - December 15th, 2010

  • Tags

    Design, Work Management

The Challenge

GIANNUZZI HOSPITAL

The hospital building was upgraded in order to comply with hospital safety and security standards (works supervision); New Surgery Unit– I stage; The Emergency Unit facilities (Emergency Surgery Unit, Emergency room ward, Acute Coronaric Care Unit) were reconstructed, re-equipped, and connected via a suspended walkway (works supervision); Facilities and technical equipment of the Surgery, Orthopaedic Care, Obstetrics and Gynaecology units were upgraded in order to comply with hospital safety and security standards; The façade was rehabilitated.

The Goal

SERVICES DELIVERED

  1. The hospital building was upgraded in order to comply with hospital safety and security standards (works supervision);
  2. New Surgery Unit– I stage;
  3. The Emergency Unit facilities (Emergency Surgery Unit, Emergency room ward, Acute Coronaric Care Unit) were reconstructed, re-equipped, and connected via a suspended walkway (works supervision);
  4. Facilities and technical equipment of the Surgery, Orthopaedic Care, Obstetrics and Gynaecology units were upgraded in order to comply with hospital safety and security standards;
  5. The façade was rehabilitated.