FLOATING DOCKS PLANT INSTALLATION IN YANBU MARINA

Task

For the project for the Marsa Yuk Yanbu Marina was proposed the solution plant of HEAVY-DUTY PONTOON LINE made of concrete structural floating docks which resulted more stable, durable, and more environmentally friendly than the other types.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 972.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Design, Project Management, Work Management

The Challenge

THE MAIN IDEA

For the project for the Marsa Yuk Yanbu Marina was proposed the solution plant of HEAVY-DUTY PONTOON LINE made of concrete structural floating docks which resulted more stable, durable, and more environmentally friendly than the other types.

The Goal

OPTIMIZING THE PROCESS

Trying to optimize the process for overall Marsa Yuk Yanbu Marina project, it was proposed the installation of the production plant and area to be located close to the slipway and that once the production and marketing of the manufactured elements had been completed, the same area could be used for producing floating docks for other customers or activities related to minor maintenance of yachts up to 25 meters.