Infrastructure and Maritime Works May 25, 2023
ABU QIR MARINE PORT TERMINAL CONTAINER
Task
The engineering services are related to the Abu Qir Marine Port Container Terminal development
Strategy
Project Review, Site supervision
Design
Work Managements, Infrastructure and works
Client
Hutchison Ports Abu Qir ContainerTerminal Company S.A.E.
Project Manager
Ing. Michelangelo Lentini
Budget
$ 320,169,656.66
Completion Date
March 21st, 2021- Ongoing
Tags
The Challenge
THE MAIN IDEA
The engineering services are related to the Abu Qir Marine Port Container Terminal development. The project includes:
- A new container terminal with a 1.2 km quay wall with depth alongside of -18 mCD & approx. 60 ha of stacking area;
- Approach channel and navigation area to the level -17.6 mCD and a 700 m diameter turning basin also at the level -17.6 mCD;
- Breakwaters;

20
20

19
19

18
18

17
17

16
16

15
15

14
14

13
13

12
12

11
11

10
10

09
09

08
08

07
07

06
06

05
05

04
04

03
03

default
default
default

default
default
default
The Goal
OPTIMIZING THE PROCESS
The works included in the construction contract are:
- Marine woks: Demolition and disposal of existing marine facilities; quay structures; facilities as: electrical, water bunkering, etc. and other quay furniture; dredging to be provided for: new quay, approach channel, turning basin, breakwaters; reclamation behind the quay wall and ground treatment; new breakwaters.
- Land based works: removal & disposal of any hazardous materials; Demolition of existing structures; Access road pavement with road marking; new in-out gate with gantries and facilities; container yard facilities; internal roadways and connections to the existing road system; ancillary works including drainage, power supply and HV and LV distribution, communication ductwork and towers, water supply system, lighting; substations; Supervision Control and data acquisition (SCADA) system; firefighting facilities; workshop and associated RTGC maintenance pad; fuel facility; drainage; upgrading of existing utilities and road connect and provision of new car-parking and bus turning area; underground ducting and drawpits for electrical RTGC.