ABU QIR MARINE PORT TERMINAL CONTAINER

Task

The engineering services are related to the Abu Qir Marine Port Container Terminal development

  • Strategy

    Project Review, Site supervision

  • Design

    Work Managements, Infrastructure and works

  • Client

    Hutchison Ports Abu Qir ContainerTerminal Company S.A.E.

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    $ 320,169,656.66

  • Completion Date

    March 21st, 2021- Ongoing

  • Tags

    Design, Project Management, Work Management

The Challenge

THE MAIN IDEA

The engineering services are related to the Abu Qir Marine Port Container Terminal development. The project includes:

  1. A new container terminal with a 1.2 km quay wall with depth alongside of -18 mCD & approx. 60 ha of stacking area;
  2. Approach channel and navigation area to the level -17.6 mCD and a 700 m diameter turning basin also at the level -17.6 mCD;
  3. Breakwaters;
The Goal

OPTIMIZING THE PROCESS

The works included in the construction contract are:

  1. Marine woks: Demolition and disposal of existing marine facilities; quay structures; facilities as: electrical, water bunkering, etc. and other quay furniture; dredging to be provided for: new quay, approach channel, turning basin, breakwaters; reclamation behind the quay wall and ground treatment; new breakwaters.
  2. Land based works: removal & disposal of any hazardous materials; Demolition of existing structures; Access road pavement with road marking; new in-out gate with gantries and facilities; container yard facilities; internal roadways and connections to the existing road system; ancillary works including drainage, power supply and HV and LV distribution, communication ductwork and towers, water supply system, lighting;  substations; Supervision Control and data acquisition (SCADA) system; firefighting facilities; workshop and associated RTGC maintenance pad; fuel facility; drainage; upgrading of existing utilities and road connect and provision of new car-parking and bus turning area; underground ducting and drawpits for electrical RTGC.