REFURBISHMENT OF DEPOTS TARANTO

The Refurbishment of Depots in Taranto is a comprehensive renovation project executed by SJS Building on behalf of SJS Srl, under the expert guidance of Engineer Lentini.

ABU QIR MARINE PORT TERMINAL CONTAINER

The engineering services are related to the Abu Qir Marine Port Container Terminal development

FLOATING DOCKS PLANT INSTALLATION IN YANBU MARINA

For the project for the Marsa Yuk Yanbu Marina was proposed the solution plant of HEAVY-DUTY PONTOON LINE made of concrete structural floating…

MARSA YUK YANBU MARINA DEVELOPMENT

The project for the Marsa Yuk Yanbu Marina concerns a series of improvements proposed to optimize the functionality and attractiveness of the marina…

MASTER PLAN OF MARSA YUK YANBU MARINA

The engineering services are related to the Yanbu Marina development. The project concerns the enhancement of Yanbu Marina masterplan.

PORT OF SOKHNA, EGYPT BUILDINGS’ DESIGN FOR AIN SOKHNA PORT CONTAINER TERMINAL

As a part of Project Management services in Pre-Contract phase, the Preliminary design for Ain Sokhna Port Container Terminal has been carried out.

SOKHNA MARINE PORT – AIN SOKHNA PORT CONTAINER TERMINAL

The engineering services of site investigation, detailed design and Supervision works are related to the Sokhna container terminal development, in Ain Sokhna Port…

PORT OF MARINA DI CARRARA MOORING DOLPHIN

The operations to extend the Taliercio Quay and the ‘verticalization’ of the quay head are configured as infrastructural adjustment interventions, both aimed at…

HOSPITAL MONALDI COTUGNO NAPLES

Rehabilitation of Hospital Pharmacy and Morgue Rehabilitation works; Fluid systems; Telecommunications network; Electric power network; Heating and air-conditioning system; Completion of Hospital Pharmacy…

PORT OF TARANTO BULK MATERIAL AREA MOLO POLISETTORIALE

The project has concerned the redevelopment of the bulk material terminal with particular attention to the existing quay, the refurbishment of the yard,…

This website stores cookies on your computer. Cookie Policy

October 28, 2022

REFURBISHMENT OF DEPOTS TARANTO

The Refurbishment of Depots in Taranto is a comprehensive renovation project executed by SJS Building on behalf of SJS Srl, under the expert guidance of Engineer Lentini.

  • Strategy

    Design For Construction, Siute Supervision, Safety Coordination during the design and execution phases

  • Design

    Project Management, Construction

  • Client

    SJS Srl

  • HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 400.000,00

  • Completion Date

    October 28th, 2022 - June 30th 2024

  • Tags

    Work Management

View Project

ABU QIR MARINE PORT TERMINAL CONTAINER

The engineering services are related to the Abu Qir Marine Port Container Terminal development

  • Strategy

    Project Review, Site supervision

  • Design

    Work Managements, Infrastructure and works

  • Client

    Hutchison Ports Abu Qir ContainerTerminal Company S.A.E.

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    $ 320,169,656.66

  • Completion Date

    March 21st, 2021- Ongoing

  • Tags

    Design, Project Management, Work Management

View Project

FLOATING DOCKS PLANT INSTALLATION IN YANBU MARINA

For the project for the Marsa Yuk Yanbu Marina was proposed the solution plant of HEAVY-DUTY PONTOON LINE made of concrete structural floating docks…

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 972.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Design, Project Management, Work Management

View Project

MARSA YUK YANBU MARINA DEVELOPMENT

The project for the Marsa Yuk Yanbu Marina concerns a series of improvements proposed to optimize the functionality and attractiveness of the marina area.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 40.488.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Design, Project Management, Work Management

View Project

MASTER PLAN OF MARSA YUK YANBU MARINA

The engineering services are related to the Yanbu Marina development. The project concerns the enhancement of Yanbu Marina masterplan.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 40.488.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Work Management

View Project

PORT OF SOKHNA, EGYPT BUILDINGS’ DESIGN FOR AIN SOKHNA PORT CONTAINER TERMINAL

As a part of Project Management services in Pre-Contract phase, the Preliminary design for Ain Sokhna Port Container Terminal has been carried out.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Infrastructures and Works

  • Client

    Hutchison Ports Red Sea Container Terminals Overseas Limited

  • Pre-Contract Management & Tender procedures

    Ing. Michelangelo Lentini

  • Budget

    $ 12.000.000,00

  • Completion Date

    May 23rd, 2023 - 30th June, 2024

  • Tags

    Work Management

View Project

SOKHNA MARINE PORT – AIN SOKHNA PORT CONTAINER TERMINAL

The engineering services of site investigation, detailed design and Supervision works are related to the Sokhna container terminal development, in Ain Sokhna Port (Egypt).

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Infrastructures and Works

  • Client

    Hutchison Ports Red Sea Container Terminals Overseas Limited

  • Pre-Contract Management & Tender procedures

    Ing. Michelangelo Lentini

  • Budget

    $ 270.000.000,00

  • Completion Date

    May 23rd, 2023 - 30th June, 2024

  • Tags

    Work Management

View Project

PORT OF MARINA DI CARRARA MOORING DOLPHIN

The operations to extend the Taliercio Quay and the ‘verticalization’ of the quay head are configured as infrastructural adjustment interventions, both aimed at improving…

  • Strategy

    Safety Coordination during construction works

  • Design

    Work Management

  • Client

    Autorità di Sistema Portuale Mar Ligure Orientale Via del Molo n. 1 19126 La Spezia

  • HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 358,861.33

  • Completion Date

    October 16th, 2020- November 3rd, 2021

  • Tags

    Work Management

View Project
April 1, 1996

HOSPITAL MONALDI COTUGNO NAPLES

Rehabilitation of Hospital Pharmacy and Morgue Rehabilitation works; Fluid systems; Telecommunications network; Electric power network; Heating and air-conditioning system; Completion of Hospital Pharmacy and…

  • Strategy

    Preliminary design, Detail design, For Construction design, Site Supervision

  • Design

    Design, Work Management

  • Client

    Azienda Ospedaliera Monaldi Cotugno –Napoli

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 950,897.82

  • Completion Date

    April 1st, 1996 - December 21st, 1998

  • Tags

    Design, Work Management

View Project

PORT OF TARANTO BULK MATERIAL AREA MOLO POLISETTORIALE

The project has concerned the redevelopment of the bulk material terminal with particular attention to the existing quay, the refurbishment of the yard, the…

  • Strategy

    Site Supervision and Safety Coordination during construction works

  • Design

    Design

  • Client

    Autorità di Sistema Portuale del Mar Ionio - Porto di Taranto T.C.T. spa Livorno

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 30.102.327,14

  • Completion Date

    November 16th, 2015 - February 7th, 2019

  • Tags

    Work Management

View Project