Infrastructure and Maritime Works

PORT OF TARANTO SEABED DEEPENING OF THE ACCESS CHANNEL TO THE MOLO POLISETTORIALE

Once that the preliminary bathymetric investigation was completed, a systematic and a detailed bathymetric survey were carried out, along with several stratigraphic analyses…

PORT OF TAMAN RUSSIA DRY CARGO

The Russian Federation Government has assigned the Investment Analysis regarding the Taman Sea Trade Port Dry Cargo Area including engineering services in order…

PORT OF TARANTO NEW BREAKWATER

The project has involved the construction of a new breakwater for the protection of the Taranto port harbor, west side, of a length…

PORT OF MARINA DI CARRARA DRY DOCK

The Italian Sea Group, formerly Nuovi Cantieri Apuania S.p.A., the historic shipyard of Marina di Carrara and the current state concessionaire in the…

CHEBOKSARY RUSSIA ETNIC CHIVASHIA PARK

Conceptional architectural and preliminary design of the 500th anniversary of Cheboksary Entertainment Park – ‘Ethnic Chuvashia’ complex situated on the north-western area of…

PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE

The project has provided, at the beginning, seabed dredging in order to allow the correct maneuvering of vessels both during access and berthing…

PORT OF TRIESTE MOLO VII

The project consists of the extension of the Molo VII – 100 m to allow the simultaneous approach of 2 ultra large container…

PORT OF BRINDISI REINFORCEMENT OF “ADMIRAL MILLO WHARF”, SAILORS’ MONUMENT AND CHANNEL PIGONATI

The project is divided in two phases: I LOT: Reinforcement of Admiral Millo wharf; II LOT: Special maintenance and reinforcement of wharfs nearby…

PORT OF MONFALCONE LNG TERMINAL

The main aim of the works will be made deeper the seabed of the port to allow LNG vessels to reach the future…

PORT OF DAMMAM KSA, EXPANSION PROJECT FASE 3

The engineering services were designed to meet the terminal operator’s need to enhance the existing quay so as to allow the simultaneous docking…

This website stores cookies on your computer. Cookie Policy

PORT OF TARANTO SEABED DEEPENING OF THE ACCESS CHANNEL TO THE MOLO POLISETTORIALE

Once that the preliminary bathymetric investigation was completed, a systematic and a detailed bathymetric survey were carried out, along with several stratigraphic analyses of…

  • Strategy

    Preliminary design, Detail design, For construction design, Site Supervision

  • Design

    Epc Activities, Design

  • Client

    T.C.T. spa - Molo Polisettoriale - 74100 Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 3,601,000.00

  • Completion Date

    March 1st, 2005 - September 21st, 2005

  • Tags

    Design, EPC Activities

View Project

PORT OF TAMAN RUSSIA DRY CARGO

The Russian Federation Government has assigned the Investment Analysis regarding the Taman Sea Trade Port Dry Cargo Area including engineering services in order to…

  • Strategy

    Feasibility Study and Investment study (Master Plan and Trade and Traffic Forecast Study)

  • Design

    Project Management, Design

  • Client

    Ministry of Transport of the Russian Federation - Federal Agency «Rostransmodernisazia» (Russian Federation)

  • Technical Coordinator and Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 5,081,112,491.00

  • Completion Date

    December 27th, 2007 - September 14th, 2009

  • Tags

    Design, Project Management

View Project

PORT OF TARANTO NEW BREAKWATER

The project has involved the construction of a new breakwater for the protection of the Taranto port harbor, west side, of a length of…

  • Strategy

    Geological and geognostical surveys and lab analyses

  • Design

    Design,

  • Client

    T.C.T. spa Livorno

  • Chief Project Manager and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 17,980,000.00

  • Completion Date

    October 3, 2012 - March 8, 2013

  • Associated consultants

    Assignment in partnership with E&G s.r.l. Rome – Geol. Aldot Teodoro Battaglia

  • Tags

    Design

View Project

PORT OF MARINA DI CARRARA DRY DOCK

The Italian Sea Group, formerly Nuovi Cantieri Apuania S.p.A., the historic shipyard of Marina di Carrara and the current state concessionaire in the port…

  • Strategy

    Preliminary design, Detail design, For Construction desig, Site supervision of geological and geothecnical surveys, bathymetric and topographic surveys

  • Design

    Project Management, Design

  • Client

    RCM Costruzioni s.r.l. Salerno

  • Project Director

    Ing. Michelangelo Lentini

  • Budget

    € 24,400,000.00

  • Completion Date

    May 1st, 2020 - January 1st, 2021

  • Tags

    Design, Project Management

View Project

CHEBOKSARY RUSSIA ETNIC CHIVASHIA PARK

Conceptional architectural and preliminary design of the 500th anniversary of Cheboksary Entertainment Park – ‘Ethnic Chuvashia’ complex situated on the north-western area of Cheboksary…

  • Strategy

    Concept design

  • Design

    Environmental Recovery Interventions, Design

  • Client

    TRIGRUPP LLC – Cheboksary (Federazione Russa)

  • Team Leader, Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 120,000,000.00

  • Completion Date

    September 1st, 2014 - October 1st, 2014

  • Tags

    Design

View Project

PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE

The project has provided, at the beginning, seabed dredging in order to allow the correct maneuvering of vessels both during access and berthing phases.

  • Strategy

    Detail design, Safety Coordination during design phase

  • Design

    Project Management, Design

  • Client

    Compagnia Porto di Civitavecchia s.p.a., Roma (Italy)

  • Team Leader and Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 235,261,195.07

  • Completion Date

    August 1st, 2008 - March 9th, 2009

  • Tags

    Design, Project Management

View Project

PORT OF TRIESTE MOLO VII

The project consists of the extension of the Molo VII – 100 m to allow the simultaneous approach of 2 ultra large container vessels.

  • Strategy

    Preliminary design, Detail Design, EiA, Plan of investigation, Site supervision of investigation, Technical-Functional Adjustment (ATF) of the current Port Master Plan Port Planning Design

  • Design

    Project Management, Design

  • Client

    TMT spa Punto Franco Nuovo 34123 Trieste

  • Chief Project Manager Site Supersor

    Ing. Michelangelo Lentini

  • Budget

    € 75,140,000.00

  • Completion Date

    September 24th, 2014 - February 2nd, 2015

  • Tags

    Design, Project Management

View Project

PORT OF BRINDISI REINFORCEMENT OF “ADMIRAL MILLO WHARF”, SAILORS’ MONUMENT AND CHANNEL PIGONATI

The project is divided in two phases: I LOT: Reinforcement of Admiral Millo wharf; II LOT: Special maintenance and reinforcement of wharfs nearby Sailors‘…

  • Strategy

    Preliminary design, Detail Design, For construction design and Safety Coordination during design phase

  • Design

    Design

  • Client

    Autorità di Sistema Portuale del Mar Adriatico Meridionale (ex Autorità Portuale di Brindisi)

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 7,587,452.64

  • Completion Date

    November 6th, 2009 - May 26th, 2010

  • Tags

    Design

View Project

PORT OF MONFALCONE LNG TERMINAL

The main aim of the works will be made deeper the seabed of the port to allow LNG vessels to reach the future terminal.…

  • Strategy

    Preliminary design, EiA

  • Design

    Design

  • Client

    COMPAGNIA PORTUALE s.r.l. Via Timavo 69/8 - Monfalcone (GO) SmartGas S.r.l., Monfalcone

  • Team Leader Chief Project Manager and Technical Coordinator of Maritime works

    Ing. Michelangelo Lentini

  • Budget

    € 147,840,972.29

  • Completion Date

    November 10th, 2014- January 23rd, 2015

  • Associated Consultants

    In partnership with D’Appolonia spa Genoa (General Contractor)

  • Tags

    Design

View Project

PORT OF DAMMAM KSA, EXPANSION PROJECT FASE 3

The engineering services were designed to meet the terminal operator’s need to enhance the existing quay so as to allow the simultaneous docking of…

  • Strategy

    Preliminary design, Feed design, procurement, site supervision of site investigation

  • Design

    Design

  • Client

    International Ports Services Co. Ltd (“IPS”), Dammam (KSA)

  • Project Director

    Ing. Michelangelo Lentini

  • Budget

    $ 72.000.000,00

  • Completion Date

    June 1st, 2016 - July 31st, 2018

  • Tags

    Design

View Project