Who am I

I Am Engineer
Michelangelo Lentini.

What do I Do

I envision realities
yet to come
at any scale.

My objective

Perfecting global
maritime
engineering.

Showcase

A selection of
my recent projects.

PORT OF SOKHNA, EGYPT BUILDINGS’ DESIGN FOR AIN SOKHNA PORT CONTAINER TERMINAL

PORT OF SOKHNA, EGYPT BUILDINGS’ DESIGN FOR AIN SOKHNA PORT CONTAINER TERMINAL

As a part of Project Management services in Pre-Contract phase, the Preliminary design for Ain Sokhna Port Container Terminal has been carried out.

Show Project
PORT OF TRIESTE ADRIA TERMINAL CRUISE

PORT OF TRIESTE ADRIA TERMINAL CRUISE

The idea of ​​designing a cruise terminal, named ADRIA TERMINAL, was born from the existence of several favorable characteristics of the area inside…

Show Project
PORT OF GIOIA TAURO WESTERN QUAY

PORT OF GIOIA TAURO WESTERN QUAY

The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m. The construction solution of…

Show Project
METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

Meteoric water drainage system upgrading works and new discharge manifold for discharge waters in the Molo Polisettoriale Container Terminal – Taranto

Show Project
NEW ANIMAL DISEASE RESEARCH INSTITUTE OF PUGLIA AND BASILICATA
Healthcare Building April 1, 1996

NEW ANIMAL DISEASE RESEARCH INSTITUTE OF PUGLIA AND BASILICATA

Construction of New Taranto Section of Animal Disease Research Institute and Fish Disease Research Institute. The building was constructed using both traditional and…

Show Project
PORT OF TARANTO MOLO POLISETTORIALE: CONTROL TOWER
Industrial Construction October 1, 2000

PORT OF TARANTO MOLO POLISETTORIALE: CONTROL TOWER

The Project has included: Rehabilitation and rejuvenation of mooring berths and yard; Medium and low voltage power network; Medium and low-voltage secondary power…

Show Project
FLOATING DOCKS PLANT INSTALLATION IN YANBU MARINA

FLOATING DOCKS PLANT INSTALLATION IN YANBU MARINA

For the project for the Marsa Yuk Yanbu Marina was proposed the solution plant of HEAVY-DUTY PONTOON LINE made of concrete structural floating…

Show Project
CONFERENCE AND SERVICE CENTER AND EXHIBITION CENTER “SUBFOR”
Public Works December 1, 1991

CONFERENCE AND SERVICE CENTER AND EXHIBITION CENTER “SUBFOR”

Reconstruction with the conversion of existing structures intended for production purposes, for their subsequent use to expand the activities of the Congress Center…

Show Project
PORT OF BRINDISI REINFORCEMENT OF “ADMIRAL MILLO WHARF”, SAILORS’ MONUMENT AND CHANNEL PIGONATI

PORT OF BRINDISI REINFORCEMENT OF “ADMIRAL MILLO WHARF”, SAILORS’ MONUMENT AND CHANNEL PIGONATI

The project is divided in two phases: I LOT: Reinforcement of Admiral Millo wharf; II LOT: Special maintenance and reinforcement of wharfs nearby…

Show Project
HOSPITAL MONALDI COTUGNO NAPLES
Healthcare Building April 1, 1996

HOSPITAL MONALDI COTUGNO NAPLES

Rehabilitation of Hospital Pharmacy and Morgue Rehabilitation works; Fluid systems; Telecommunications network; Electric power network; Heating and air-conditioning system; Completion of Hospital Pharmacy…

Show Project
PORT OF TAMAN RUSSIA DRY CARGO

PORT OF TAMAN RUSSIA DRY CARGO

The Russian Federation Government has assigned the Investment Analysis regarding the Taman Sea Trade Port Dry Cargo Area including engineering services in order…

Show Project
PORT OF TARANTO: GATE
Industrial Construction October 6, 2004

PORT OF TARANTO: GATE

The project, developed as part of the broader design service for the container terminal at the Molo Polisettiriale of Port of Taranto, involved,…

Show Project
CHEBOKSARY RUSSIA NEW LARGE RESIDENTIAL AREA SADOVY RION
Civil Buildings October 1, 2012

CHEBOKSARY RUSSIA NEW LARGE RESIDENTIAL AREA SADOVY RION

The Design of new large residential complex in Cheboksary city named as ‘Sadovy Raion’ (‘Garden District’) (areas 3-3A-2-4): 10 residential buildings on the…

Show Project
MASTER PLAN OF MARSA YUK YANBU MARINA

MASTER PLAN OF MARSA YUK YANBU MARINA

The engineering services are related to the Yanbu Marina development. The project concerns the enhancement of Yanbu Marina masterplan.

Show Project
PORT OF OLBIA INTEGRATED SAFETY SYSTEM IN THE PORT AREAS
Installation December 1, 2007

PORT OF OLBIA INTEGRATED SAFETY SYSTEM IN THE PORT AREAS

Integrated Safety System in the port areas of “Pontile Isola Bianca” in Olbia,”Porto Cocciani” in Olbia and “Golfo Aranci Trade Port”

Show Project
PORT OF TARANTO RECOVERY AND REUSE OF THE DREDGING MATERIAL DEPOSITED IN THE EX-YARD BELLELI TANKS

PORT OF TARANTO RECOVERY AND REUSE OF THE DREDGING MATERIAL DEPOSITED IN THE EX-YARD BELLELI TANKS

Redevelopment and upgrading of the Molo Polisettoriale: Recovery and reuse of the dredging material deposited in the ex-yard Belleli tanks – Art.184-Quater Legislative…

Show Project
ABU QIR MARINE PORT TERMINAL CONTAINER

ABU QIR MARINE PORT TERMINAL CONTAINER

The engineering services are related to the Abu Qir Marine Port Container Terminal development

Show Project
PORT OF TARANTO MOLO POLISETTORIALE: RENOVATION OF 3 OFFICE BUILDINGS

PORT OF TARANTO MOLO POLISETTORIALE: RENOVATION OF 3 OFFICE BUILDINGS

CONTAINER TERMINAL FACILITIES FOR THE COMPANY “TCT SPA” Renovation of 3 Office Buildings

Show Project
TARANTO SPORT COMPLEX
Civil Buildings March 1, 1989

TARANTO SPORT COMPLEX

A Sports Complex of Taranto: technical solutions for roofing and ventilation systems: Total area: 5,000 sqm; Total volume: 23,300 cbm; Outdoor sports facilities: 3,000 sqm; A…

Show Project
ARCELOR MITTAL RAINWATER

ARCELOR MITTAL RAINWATER

The Services provided include ‘engineering services-design, procurement and project management’ aimed to support the technical offices throughout the rainwater system redevelopment in Taranto…

Show Project
METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

Meteoric water drainage system upgrading works and new discharge manifold for discharge waters in the Molo Polisettoriale Container Terminal

Show Project
DSK SUOR FACTORY CHEBOKSARY (RUSSIA)
Industrial Construction October 22, 2013

DSK SUOR FACTORY CHEBOKSARY (RUSSIA)

The key elements of the DSK SUOR office modernisation project were: the territorial planning and design of all the outdoor areas have been…

Show Project
MARSA YUK YANBU MARINA DEVELOPMENT

MARSA YUK YANBU MARINA DEVELOPMENT

The project for the Marsa Yuk Yanbu Marina concerns a series of improvements proposed to optimize the functionality and attractiveness of the marina…

Show Project
CHEBOKSARY RUSSIA ETNIC CHIVASHIA PARK

CHEBOKSARY RUSSIA ETNIC CHIVASHIA PARK

Conceptional architectural and preliminary design of the 500th anniversary of Cheboksary Entertainment Park – ‘Ethnic Chuvashia’ complex situated on the north-western area of…

Show Project
PORT OF DAMMAM KSA, EXPANSION PROJECT FASE 3

PORT OF DAMMAM KSA, EXPANSION PROJECT FASE 3

The engineering services were designed to meet the terminal operator’s need to enhance the existing quay so as to allow the simultaneous docking…

Show Project
GIANNUZZI HOSPITAL IN MANDURIA (TARANTO)
Healthcare Building December 1, 2004

GIANNUZZI HOSPITAL IN MANDURIA (TARANTO)

The hospital building was upgraded in order to comply with hospital safety and security standards (works supervision).

Show Project
PORT OF TARANTO: SAN CATALDO CONTAINER TERMINAL YILPORT
Industrial Construction March 25, 2021

PORT OF TARANTO: SAN CATALDO CONTAINER TERMINAL YILPORT

The San Cataldo Container Terminal (SCCT), concessionaire of the areas and quay of the Molo Polisettoriale in Taranto, has started the activities of…

Show Project
INTEGRATED PROGRAM OF URBAN REGENERATION TARANTO
Civil Buildings October 1, 2015

INTEGRATED PROGRAM OF URBAN REGENERATION TARANTO

Redevelopment of the old town of Taranto identified as a Sector 12: Redevelopment area and garden market called “discesa Vasto”; Redevelopment of private…

Show Project
PORT OF MARINA DI CARRARA DRY DOCK

PORT OF MARINA DI CARRARA DRY DOCK

The Italian Sea Group, formerly Nuovi Cantieri Apuania S.p.A., the historic shipyard of Marina di Carrara and the current state concessionaire in the…

Show Project
PORT OF TARANTO BULK MATERIAL AREA MOLO POLISETTORIALE

PORT OF TARANTO BULK MATERIAL AREA MOLO POLISETTORIALE

The project has concerned the redevelopment of the bulk material terminal with particular attention to the existing quay, the refurbishment of the yard,…

Show Project
YACHTING MARINA OF TORRE D’AYALA – TARANTO

YACHTING MARINA OF TORRE D’AYALA – TARANTO

MASTER PLAN AND PRELIMINARY DESIGN OF THE YACHTING MARINA OF TORRE D’AYALA

Show Project
PORT OF TRIESTE MOLO VII

PORT OF TRIESTE MOLO VII

The project consists of the extension of the Molo VII – 100 m to allow the simultaneous approach of 2 ultra large container…

Show Project
PORT OF MONFALCONE LNG TERMINAL

PORT OF MONFALCONE LNG TERMINAL

The main aim of the works will be made deeper the seabed of the port to allow LNG vessels to reach the future…

Show Project
REFURBISHMENT OF DEPOTS TARANTO
Civil Buildings October 28, 2022

REFURBISHMENT OF DEPOTS TARANTO

The Refurbishment of Depots in Taranto is a comprehensive renovation project executed by SJS Building on behalf of SJS Srl, under the expert guidance of Engineer Lentini.

Show Project
GIANNUZZI HOSPITAL IN MANDURIA (TARANTO) NEW SURGERY AREA
Healthcare Building July 1, 2003

GIANNUZZI HOSPITAL IN MANDURIA (TARANTO) NEW SURGERY AREA

Renovation and adaptation of structures and technologies to regulations regarding safety and health in the workplace Adaptation and completion of the structure and…

Show Project
PORT OF BRINDISI QUAY “PUNTA DELLE TERRARE”

PORT OF BRINDISI QUAY “PUNTA DELLE TERRARE”

Urgent works for securing the port structure of the zoop Quay, realization of RO-RO berth at the Costa Morena, in the Port of…

Show Project
PORT OF OLBIA SNO YACT MARINE CENTER

PORT OF OLBIA SNO YACT MARINE CENTER

The project, born from an idea of a refit company already present in the port of Olbia, provides for the acquisition of new…

Show Project
TARANTO CITY LIBRARY
Civil Buildings August 1, 1995

TARANTO CITY LIBRARY

The new Cultural Centre and the new City Library Total area – 3,800 sqm Total volume – 13.300 cbm

Show Project
PORT OF MARINA DI CARRARA MOORING DOLPHIN

PORT OF MARINA DI CARRARA MOORING DOLPHIN

The operations to extend the Taliercio Quay and the ‘verticalization’ of the quay head are configured as infrastructural adjustment interventions, both aimed at…

Show Project
PORT OF TRIESTE Rizzo Sud Breakwater

PORT OF TRIESTE Rizzo Sud Breakwater

The study first involved the evaluation of the static conditions of the ‘Luigi Rizzo Sud’ breakwater in case of mooring of different types…

Show Project
PORSCHE CENTER NARDO’ LECCE

PORSCHE CENTER NARDO’ LECCE

The Nardò Technical Centre is a centre for the development and testing of prototype vehicles, consisting of more than 20 tracks, one of…

Show Project
SOKHNA MARINE PORT – AIN SOKHNA PORT CONTAINER TERMINAL

SOKHNA MARINE PORT – AIN SOKHNA PORT CONTAINER TERMINAL

The engineering services of site investigation, detailed design and Supervision works are related to the Sokhna container terminal development, in Ain Sokhna Port…

Show Project
PORT OF BRINDISI WESTERN BASIN

PORT OF BRINDISI WESTERN BASIN

Emergency Safety Plan and depollution of the Western Basin of the Port of Brindisi

Show Project
PORT OF TARANTO NEW BREAKWATER

PORT OF TARANTO NEW BREAKWATER

The project has involved the construction of a new breakwater for the protection of the Taranto port harbor, west side, of a length…

Show Project
UFFICI E AMBULATORI INAIL TARANTO
Healthcare Building May 11, 2019

UFFICI E AMBULATORI INAIL TARANTO

The project concerns the refurbishment of a building of great architectural value, which has been disused for several years, to become the new…

Show Project
PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE

PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE

The project has provided, at the beginning, seabed dredging in order to allow the correct maneuvering of vessels both during access and berthing…

Show Project
TORVALDALIGA NORD TERMAL POWER PLANT ENEL CIVITAVECCHIA

TORVALDALIGA NORD TERMAL POWER PLANT ENEL CIVITAVECCHIA

The The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m. The construction solution…

Show Project
TORVALDALIGA NORD TERMAL POWER PLANT ENEL CIVITAVECCHIA: COASTAL FILL “LA MATTONARA”

TORVALDALIGA NORD TERMAL POWER PLANT ENEL CIVITAVECCHIA: COASTAL FILL “LA MATTONARA”

The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m. The construction solution of…

Show Project
PORT OF TARANTO MOORING QUAY “CALATA V”

PORT OF TARANTO MOORING QUAY “CALATA V”

Port of Taranto, Italy COMPLETION OF THE RENOVATION WORKS OF THE MOORING QUAY “CALATA V”

Show Project
PORT OF BANGKOK LAEM CHABANG THAILAND

PORT OF BANGKOK LAEM CHABANG THAILAND

The project has included the realization of a Logistics Park in Bangkok Free Trade Zone, in two different layouts.

Show Project
NEW PREMISES OF THE COURT OF FIRST INSTANCE, COURT OF APPEAL AND COURT OF JUSTICE
Public Works September 1, 1993

NEW PREMISES OF THE COURT OF FIRST INSTANCE, COURT OF APPEAL AND COURT OF JUSTICE

New Premises of the Court of First Instance, Court of Appeal and Court of Justice of Lecce, Taranto Branch, located in the Paolo…

Show Project
PORT OF COSTANZA, ROMANIA

PORT OF COSTANZA, ROMANIA

The Romanian coast along the Black Sea is subject to erosion processes that not only cause the loss of particularly valuable land but…

Show Project
PORT OF TARANTO SEABED DEEPENING OF THE ACCESS CHANNEL TO THE MOLO POLISETTORIALE

PORT OF TARANTO SEABED DEEPENING OF THE ACCESS CHANNEL TO THE MOLO POLISETTORIALE

Once that the preliminary bathymetric investigation was completed, a systematic and a detailed bathymetric survey were carried out, along with several stratigraphic analyses…

Show Project
Scroll
My Vision

Design and Project Management

Italian Excellence

Drawing on years of refined design expertise, the latest technologies, and international experience, I am excited to offer innovative services and consultancy for your projects.

 

My goal is to ensure that your projects are highly productive, uniquely Italian in design, cost-effective, and environmentally sustainable.

My Purpose

The Operational Structure

The SJS Family

There are people who have been with me from the very beginning of this mission. Without them, every endeavor would be nothing more than wishful thinking.

 

These are experienced individuals, passionate about the work we do and eager to take on new challenges. SJS is a family where each of them finds their place. Over the past 35 years, more than two hundred people have been part of SJS: engineers, architects, designers, artists in both drawing and multimedia production, as well as technicians, environmental experts, and interpreters—most of whom have become friends.

0

active
years

0

delivered
projects

Collaboration

Let’s talk.

What does the future hold?

Routine engineering tasks will soon be handled by artificial intelligence, eliminating the need for standard, mundane, and repetitive services, delivered everywhere at uniform costs.

Competing in that space isn’t our focus. But if your goal is to create something that has never been done before, to bring a unique project to life in our country, or to find a partner who will stand by your side throughout the process, then you’ve come to the right place.

This website stores cookies on your computer. Cookie Policy

PORT OF SOKHNA, EGYPT BUILDINGS’ DESIGN FOR AIN SOKHNA PORT CONTAINER TERMINAL

As a part of Project Management services in Pre-Contract phase, the Preliminary design for Ain Sokhna Port Container Terminal has been carried out.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Infrastructures and Works

  • Client

    Hutchison Ports Red Sea Container Terminals Overseas Limited

  • Pre-Contract Management & Tender procedures

    Ing. Michelangelo Lentini

  • Budget

    $ 12.000.000,00

  • Completion Date

    May 23rd, 2023 - 30th June, 2024

  • Tags

    Work Management

View Project

PORT OF TRIESTE ADRIA TERMINAL CRUISE

The idea of ​​designing a cruise terminal, named ADRIA TERMINAL, was born from the existence of several favorable characteristics of the area inside the…

  • Strategy

    Technical and economical feasibility study

  • Design

    Design

  • Client

    GSI Logistic s.r.l. Livorno

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 197,129,718.79

  • Completion Date

    March 1st, 2018 - March 31st, 2018

  • Tags

    Design

View Project

PORT OF GIOIA TAURO WESTERN QUAY

The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m. The construction solution of the…

  • Strategy

    Site supervision, Safety Coordination during construction Phase

  • Design

    Infrastructure and maritime works, work management

  • Client

    Autorità di Sistema Portuale dei Mari Tirreno Meridionale e Ionio

  • Site Manager and HSE Manager

    Eng. Michelangelo Lentini

  • Budget

    € 16.579.246,90

  • Completion Date

    March 25th, 2021 - February 9th, 2024

View Project

METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

Meteoric water drainage system upgrading works and new discharge manifold for discharge waters in the Molo Polisettoriale Container Terminal – Taranto

  • Strategy

    Detail design, For construction Design, Safety Coordination during design phase

  • Design

    Project Managemen, Design

  • Client

    T.C.T. spa - Scali Cerere n. 9 57122 LIVORNO

  • Chief Project Manager and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,301,508.31

  • Completion Date

    February 15th, 2013 - April 2nd, 2013

  • Tags

    Design, EPC Activities

View Project
April 1, 1996

NEW ANIMAL DISEASE RESEARCH INSTITUTE OF PUGLIA AND BASILICATA

Construction of New Taranto Section of Animal Disease Research Institute and Fish Disease Research Institute. The building was constructed using both traditional and innovative…

  • Strategy

    For Construction design, Site Supervision

  • Design

    Design, work management

  • Client

    Istituto Zooprofilattico Sperimentale di Puglia e Basilicata - Via Manfredonia, 20 - Foggia

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 1,710,127.88

  • Completion Date

    April 1st, 1996 - August 4, 1999

  • Tags

    Design, Work Management

View Project
October 1, 2000

PORT OF TARANTO MOLO POLISETTORIALE: CONTROL TOWER

The Project has included: Rehabilitation and rejuvenation of mooring berths and yard; Medium and low voltage power network; Medium and low-voltage secondary power network;…

  • Strategy

    Site supervision, Safety Coordination during construction Phase

  • Design

    Preliminary design, Detail design, For construction design, Site Supervision

  • Client

    T.C.T. spa - Molo Polisettoriale - 74100 Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 945,116.12

  • Completion Date

    October 1st, 2000 - April 20th, 2001

  • Tags

    Design, EPC Activities

View Project

FLOATING DOCKS PLANT INSTALLATION IN YANBU MARINA

For the project for the Marsa Yuk Yanbu Marina was proposed the solution plant of HEAVY-DUTY PONTOON LINE made of concrete structural floating docks…

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 972.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Design, Project Management, Work Management

View Project
December 1, 1991

CONFERENCE AND SERVICE CENTER AND EXHIBITION CENTER “SUBFOR”

Reconstruction with the conversion of existing structures intended for production purposes, for their subsequent use to expand the activities of the Congress Center and…

  • Strategy

    Preliminary design, Detail design, For Construction design, Site Supervision

  • Design

    Design, Work Management

  • Client

    C.C.I.A.A. di Taranto – Viale Virgilio 119, Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 2,571,598.94

  • Completion Date

    December 1st, 1991 - December 1st, 1995

  • Tags

    Design, Work Management

View Project

PORT OF BRINDISI REINFORCEMENT OF “ADMIRAL MILLO WHARF”, SAILORS’ MONUMENT AND CHANNEL PIGONATI

The project is divided in two phases: I LOT: Reinforcement of Admiral Millo wharf; II LOT: Special maintenance and reinforcement of wharfs nearby Sailors‘…

  • Strategy

    Preliminary design, Detail Design, For construction design and Safety Coordination during design phase

  • Design

    Design

  • Client

    Autorità di Sistema Portuale del Mar Adriatico Meridionale (ex Autorità Portuale di Brindisi)

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 7,587,452.64

  • Completion Date

    November 6th, 2009 - May 26th, 2010

  • Tags

    Design

View Project
April 1, 1996

HOSPITAL MONALDI COTUGNO NAPLES

Rehabilitation of Hospital Pharmacy and Morgue Rehabilitation works; Fluid systems; Telecommunications network; Electric power network; Heating and air-conditioning system; Completion of Hospital Pharmacy and…

  • Strategy

    Preliminary design, Detail design, For Construction design, Site Supervision

  • Design

    Design, Work Management

  • Client

    Azienda Ospedaliera Monaldi Cotugno –Napoli

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 950,897.82

  • Completion Date

    April 1st, 1996 - December 21st, 1998

  • Tags

    Design, Work Management

View Project

PORT OF TAMAN RUSSIA DRY CARGO

The Russian Federation Government has assigned the Investment Analysis regarding the Taman Sea Trade Port Dry Cargo Area including engineering services in order to…

  • Strategy

    Feasibility Study and Investment study (Master Plan and Trade and Traffic Forecast Study)

  • Design

    Project Management, Design

  • Client

    Ministry of Transport of the Russian Federation - Federal Agency «Rostransmodernisazia» (Russian Federation)

  • Technical Coordinator and Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 5,081,112,491.00

  • Completion Date

    December 27th, 2007 - September 14th, 2009

  • Tags

    Design, Project Management

View Project
October 6, 2004

PORT OF TARANTO: GATE

The project, developed as part of the broader design service for the container terminal at the Molo Polisettiriale of Port of Taranto, involved, in…

  • Strategy

    Preliminary design, Detail design, For Construction design, Safety Coordination during the design phase and Site Supervision

  • Design

    Infrastructure and maritime works, work management

  • Client

    Autorità Portuale di Taranto Porto Mercantile - 74100 Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 1,560,759.14

  • Completion Date

    October 6th , 2004 - October 9th, 2006

  • Tags

    Design

View Project
October 1, 2012

CHEBOKSARY RUSSIA NEW LARGE RESIDENTIAL AREA SADOVY RION

The Design of new large residential complex in Cheboksary city named as ‘Sadovy Raion’ (‘Garden District’) (areas 3-3A-2-4): 10 residential buildings on the Dementiev…

  • Strategy

    Concept design, Preliminary design, Detail design

  • Design

    Design

  • Client

    SUOR LLC – Cheboksary (Russian Federation)

  • Team Leader, Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 100,163,000.00

  • Completion Date

    October 1st, 2012 - December 1st, 2014

  • Tags

    Design

View Project

MASTER PLAN OF MARSA YUK YANBU MARINA

The engineering services are related to the Yanbu Marina development. The project concerns the enhancement of Yanbu Marina masterplan.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 40.488.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Work Management

View Project
December 1, 2007

PORT OF OLBIA INTEGRATED SAFETY SYSTEM IN THE PORT AREAS

Integrated Safety System in the port areas of “Pontile Isola Bianca” in Olbia,”Porto Cocciani” in Olbia and “Golfo Aranci Trade Port”

  • Strategy

    Preliminary Design, Detail design, For construction design, Safety Coordination during the design stage

  • Design

    Design

  • Client

    Autorità Portuale di Olbia e Golfo Aranci

  • Chief Project Manager, HSE manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,977,978.32

  • Completion Date

    December 1st, 2007 - December 31st, 2007

  • Tags

    Design

View Project

PORT OF TARANTO RECOVERY AND REUSE OF THE DREDGING MATERIAL DEPOSITED IN THE EX-YARD BELLELI TANKS

Redevelopment and upgrading of the Molo Polisettoriale: Recovery and reuse of the dredging material deposited in the ex-yard Belleli tanks – Art.184-Quater Legislative Decree…

  • Strategy

    Preliminary design, Detail design, For Construction desig, EiA, Site Supervision

  • Design

    Epc Activities, Permitting

  • Client

    T.C.T. spa - Scali Cerere n. 9 57122 LIVORNO

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 2,520,000.00

  • Completion Date

    July 25th, 2011 - August 11th, 2016

  • Tags

    EPC Activities, Permitting

View Project

ABU QIR MARINE PORT TERMINAL CONTAINER

The engineering services are related to the Abu Qir Marine Port Container Terminal development

  • Strategy

    Project Review, Site supervision

  • Design

    Work Managements, Infrastructure and works

  • Client

    Hutchison Ports Abu Qir ContainerTerminal Company S.A.E.

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    $ 320,169,656.66

  • Completion Date

    March 21st, 2021- Ongoing

  • Tags

    Design, Project Management, Work Management

View Project

PORT OF TARANTO MOLO POLISETTORIALE: RENOVATION OF 3 OFFICE BUILDINGS

CONTAINER TERMINAL FACILITIES FOR THE COMPANY “TCT SPA” Renovation of 3 Office Buildings

  • Strategy

    Preliminary design, Detail design, For Construction design, Safety Coordination during the design phase and Site Supervision

  • Design

    Epc Activities, Design

  • Client

    T.C.T. spa - Molo Polisettoriale - Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 3,709,772.70

  • Completion Date

    December 1st, 1999 - June 30th, 2001

  • Tags

    Design, EPC Activities

View Project
March 1, 1989

TARANTO SPORT COMPLEX

A Sports Complex of Taranto: technical solutions for roofing and ventilation systems: Total area: 5,000 sqm; Total volume: 23,300 cbm; Outdoor sports facilities: 3,000 sqm; A multi-purpose…

  • Strategy

    Preliminary design, Detail design, For Construction design, Site Supervision

  • Design

    Design, Work Management

  • Client

    FIOM-CGIL di Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 1,061,056.99

  • Completion Date

    March 1st, 1989- January 1st, 1992

  • Tags

    Design, Work Management

View Project

ARCELOR MITTAL RAINWATER

The Services provided include ‘engineering services-design, procurement and project management’ aimed to support the technical offices throughout the rainwater system redevelopment in Taranto Factory.

  • Strategy

    Project Management

  • Design

    Project Management

  • Client

    ARCELOR MITTAL Italia spa

  • Capo Progetto Project Director

    Eng.. Michelangelo Lentini

  • Budget

    € 80,000,000.00

  • Completion Date

    April 15th, 2019 - March 13th, 2020

View Project

METEORIC WATER DRAINAGE SYSTEM UPGRADING PORT OF TARANTO

Meteoric water drainage system upgrading works and new discharge manifold for discharge waters in the Molo Polisettoriale Container Terminal

  • Strategy

    Site supervision and Safety Coordination during construction works

  • Design

    Epc Activities, Design

  • Client

    T.C.T. spa - Scali Cerere n. 9 57122 LIVORNO

  • Site supervisori and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 173,635.19

  • Completion Date

    February 1st, 2013 - December 1st, 2014

  • Tags

    Design, Project Management

View Project
October 22, 2013

DSK SUOR FACTORY CHEBOKSARY (RUSSIA)

The key elements of the DSK SUOR office modernisation project were: the territorial planning and design of all the outdoor areas have been re-evaluated…

  • Strategy

    65 / 5.000 Executive design, Construction management and Execution of works

  • Design

    Epc Activities, Project Management

  • Client

    SUOR, LLC 428022, Chuvash Republic, Cheboksary Kalinina St. 107 - RUSSIAN FEDERATION

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 400.000.000,00

  • Completion Date

    October 22nd, 2013 - May 10th, 2014

  • Tags

    EPC Activities, Project Management

View Project

MARSA YUK YANBU MARINA DEVELOPMENT

The project for the Marsa Yuk Yanbu Marina concerns a series of improvements proposed to optimize the functionality and attractiveness of the marina area.

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Industrial Construction

  • Client

    HASCO Group

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 40.488.000,00

  • Completion Date

    May 23rd, 2023- Ongoing

  • Tags

    Design, Project Management, Work Management

View Project

CHEBOKSARY RUSSIA ETNIC CHIVASHIA PARK

Conceptional architectural and preliminary design of the 500th anniversary of Cheboksary Entertainment Park – ‘Ethnic Chuvashia’ complex situated on the north-western area of Cheboksary…

  • Strategy

    Concept design

  • Design

    Environmental Recovery Interventions, Design

  • Client

    TRIGRUPP LLC – Cheboksary (Federazione Russa)

  • Team Leader, Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 120,000,000.00

  • Completion Date

    September 1st, 2014 - October 1st, 2014

  • Tags

    Design

View Project

PORT OF DAMMAM KSA, EXPANSION PROJECT FASE 3

The engineering services were designed to meet the terminal operator’s need to enhance the existing quay so as to allow the simultaneous docking of…

  • Strategy

    Preliminary design, Feed design, procurement, site supervision of site investigation

  • Design

    Design

  • Client

    International Ports Services Co. Ltd (“IPS”), Dammam (KSA)

  • Project Director

    Ing. Michelangelo Lentini

  • Budget

    $ 72.000.000,00

  • Completion Date

    June 1st, 2016 - July 31st, 2018

  • Tags

    Design

View Project
December 1, 2004

GIANNUZZI HOSPITAL IN MANDURIA (TARANTO)

The hospital building was upgraded in order to comply with hospital safety and security standards (works supervision).

  • Strategy

    Preliminary design, Detail design, For Construction design, Safety Coordination during design phase, Site Supervision

  • Design

    Design, Work Management

  • Client

    ASL-TA/1 - Viale Virgilio, 31 - 74100 Taranto

  • Chief Project Manager and Site Supervisor, HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 4,890,621.85

  • Completion Date

    December 1st, 2004 - December 15th, 2010

  • Tags

    Design, Work Management

View Project
March 25, 2021

PORT OF TARANTO: SAN CATALDO CONTAINER TERMINAL YILPORT

The San Cataldo Container Terminal (SCCT), concessionaire of the areas and quay of the Molo Polisettoriale in Taranto, has started the activities of requalification…

  • Strategy

    For Construction design

  • Design

    Epc Activities, Design

  • Client

    SCCT spa S.S. 106 Ionica Molo Polisettoriale 74123 Taranto

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,597,080.56

  • Completion Date

    March 25th, 2021 - February 9th, 2024

  • Tags

    Design, EPC Activities

View Project
October 1, 2015

INTEGRATED PROGRAM OF URBAN REGENERATION TARANTO

Redevelopment of the old town of Taranto identified as a Sector 12: Redevelopment area and garden market called “discesa Vasto”; Redevelopment of private buildings…

  • Strategy

    Concept design, Preliminary design

  • Design

    Design

  • Client

    Comune di Taranto

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 7,870,000.00

  • Completion Date

    October 1st, 2015- October 31st, 2015

  • Tags

    Design

View Project

PORT OF MARINA DI CARRARA DRY DOCK

The Italian Sea Group, formerly Nuovi Cantieri Apuania S.p.A., the historic shipyard of Marina di Carrara and the current state concessionaire in the port…

  • Strategy

    Preliminary design, Detail design, For Construction desig, Site supervision of geological and geothecnical surveys, bathymetric and topographic surveys

  • Design

    Project Management, Design

  • Client

    RCM Costruzioni s.r.l. Salerno

  • Project Director

    Ing. Michelangelo Lentini

  • Budget

    € 24,400,000.00

  • Completion Date

    May 1st, 2020 - January 1st, 2021

  • Tags

    Design, Project Management

View Project

PORT OF TARANTO BULK MATERIAL AREA MOLO POLISETTORIALE

The project has concerned the redevelopment of the bulk material terminal with particular attention to the existing quay, the refurbishment of the yard, the…

  • Strategy

    Site Supervision and Safety Coordination during construction works

  • Design

    Design

  • Client

    Autorità di Sistema Portuale del Mar Ionio - Porto di Taranto T.C.T. spa Livorno

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 30.102.327,14

  • Completion Date

    November 16th, 2015 - February 7th, 2019

  • Tags

    Work Management

View Project

YACHTING MARINA OF TORRE D’AYALA – TARANTO

MASTER PLAN AND PRELIMINARY DESIGN OF THE YACHTING MARINA OF TORRE D’AYALA

  • Strategy

    Master Plan, Preliminary Design

  • Design

    Design, Work Management, Project Management

  • Client

    Marina Mar Grande Srl

  • Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 6,309,634.00

  • Completion Date

    Ongoing

  • Tags

    Design, Project Management

View Project

PORT OF TRIESTE MOLO VII

The project consists of the extension of the Molo VII – 100 m to allow the simultaneous approach of 2 ultra large container vessels.

  • Strategy

    Preliminary design, Detail Design, EiA, Plan of investigation, Site supervision of investigation, Technical-Functional Adjustment (ATF) of the current Port Master Plan Port Planning Design

  • Design

    Project Management, Design

  • Client

    TMT spa Punto Franco Nuovo 34123 Trieste

  • Chief Project Manager Site Supersor

    Ing. Michelangelo Lentini

  • Budget

    € 75,140,000.00

  • Completion Date

    September 24th, 2014 - February 2nd, 2015

  • Tags

    Design, Project Management

View Project

PORT OF MONFALCONE LNG TERMINAL

The main aim of the works will be made deeper the seabed of the port to allow LNG vessels to reach the future terminal.…

  • Strategy

    Preliminary design, EiA

  • Design

    Design

  • Client

    COMPAGNIA PORTUALE s.r.l. Via Timavo 69/8 - Monfalcone (GO) SmartGas S.r.l., Monfalcone

  • Team Leader Chief Project Manager and Technical Coordinator of Maritime works

    Ing. Michelangelo Lentini

  • Budget

    € 147,840,972.29

  • Completion Date

    November 10th, 2014- January 23rd, 2015

  • Associated Consultants

    In partnership with D’Appolonia spa Genoa (General Contractor)

  • Tags

    Design

View Project
October 28, 2022

REFURBISHMENT OF DEPOTS TARANTO

The Refurbishment of Depots in Taranto is a comprehensive renovation project executed by SJS Building on behalf of SJS Srl, under the expert guidance of Engineer Lentini.

  • Strategy

    Design For Construction, Siute Supervision, Safety Coordination during the design and execution phases

  • Design

    Project Management, Construction

  • Client

    SJS Srl

  • HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 400.000,00

  • Completion Date

    October 28th, 2022 - June 30th 2024

  • Tags

    Work Management

View Project
July 1, 2003

GIANNUZZI HOSPITAL IN MANDURIA (TARANTO) NEW SURGERY AREA

Renovation and adaptation of structures and technologies to regulations regarding safety and health in the workplace Adaptation and completion of the structure and systems…

  • Strategy

    Preliminary design, Detail design, For Construction design, Safety Coordination during design phase, Site Supervision

  • Design

    Design, work management

  • Client

    ASL-TA/1 - Viale Virgilio, 31 - 74100 Taranto

  • Site Manager and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,607,499.37

  • Completion Date

    July 1st, 2003 -March 17th, 2007

  • Tags

    Design, Work Management

View Project

PORT OF BRINDISI QUAY “PUNTA DELLE TERRARE”

Urgent works for securing the port structure of the zoop Quay, realization of RO-RO berth at the Costa Morena, in the Port of Brindisi.…

  • Strategy

    Detail design, For construction design, Safety Coordination during design phase

  • Design

    Design

  • Client

    Autorità di Sistema Portuale del Mar Adriatico Meridionale (ex Autorità Portuale di Brindisi)

  • Chief Project Manager and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    €330,000.00

  • Completion Date

    March 27th, 2017 - July 1st, 2018

  • Tags

    Design

View Project

PORT OF OLBIA SNO YACT MARINE CENTER

The project, born from an idea of a refit company already present in the port of Olbia, provides for the acquisition of new areas,…

  • Strategy

    Feasibility Study

  • Design

    Technical Financial Consultancy, Project Management

  • Client

    NB Aurora Holding S.à r.l. Luxemburg SNO YACHT Olbia)

  • Team Leader Project Coordinator

    Ing. Michelangelo Lentini

  • Budget

    € 125,000,000.00

  • Completion Date

    July 1st, 2021 - Decemeber 31st, 2021

  • Tags

    Project Management

View Project
August 1, 1995

TARANTO CITY LIBRARY

The new Cultural Centre and the new City Library Total area – 3,800 sqm Total volume – 13.300 cbm

  • Strategy

    Preliminary design, Detail design, For Construction design, Site Supervision

  • Design

    Design, Work Management

  • Client

    Boccardi Center s.r.l.- Taranto; Ente appaltante: Comune di Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 620,532.07

  • Completion Date

    August 1st, 1995 - July 1st, 1996

  • Tags

    Design, Work Management

View Project

PORT OF MARINA DI CARRARA MOORING DOLPHIN

The operations to extend the Taliercio Quay and the ‘verticalization’ of the quay head are configured as infrastructural adjustment interventions, both aimed at improving…

  • Strategy

    Safety Coordination during construction works

  • Design

    Work Management

  • Client

    Autorità di Sistema Portuale Mar Ligure Orientale Via del Molo n. 1 19126 La Spezia

  • HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 358,861.33

  • Completion Date

    October 16th, 2020- November 3rd, 2021

  • Tags

    Work Management

View Project

PORT OF TRIESTE Rizzo Sud Breakwater

The study first involved the evaluation of the static conditions of the ‘Luigi Rizzo Sud’ breakwater in case of mooring of different types of…

  • Strategy

    Detail design, Safety Coordination during design Phase

  • Design

    PROJECT MANAGEMENT, DESIGN

  • Client

    Autorità di Sistema Portuale Mar Adriatico Orientale

  • Project Director

    Ing. Michelangelo Lentini

  • Budget

    € 4,997,737.10

  • Completion Date

    June 10th, 2020 - October 1st, 2023

  • Associated Consultants

    Progettista OOMM e CSP Ing. A. PORRETTI Geol. Carlo Alberto MASOLI

  • Tags

    Design, Project Management

View Project

PORSCHE CENTER NARDO’ LECCE

The Nardò Technical Centre is a centre for the development and testing of prototype vehicles, consisting of more than 20 tracks, one of which…

  • Strategy

    Pre-construction design

  • Design

    Industrial Construction, Design

  • Client

    STRABAG

  • Project Coordinator

    Ing. Michelangelo Lentini

  • Budget

    € 26,000,000.00

  • Completion Date

    July 21st, 2021 - December 31st, 2021

  • Tags

    Design

View Project

SOKHNA MARINE PORT – AIN SOKHNA PORT CONTAINER TERMINAL

The engineering services of site investigation, detailed design and Supervision works are related to the Sokhna container terminal development, in Ain Sokhna Port (Egypt).

  • Strategy

    Project Management, Procurement, Design and Site Supervision Services

  • Design

    Work Managements, Infrastructures and Works

  • Client

    Hutchison Ports Red Sea Container Terminals Overseas Limited

  • Pre-Contract Management & Tender procedures

    Ing. Michelangelo Lentini

  • Budget

    $ 270.000.000,00

  • Completion Date

    May 23rd, 2023 - 30th June, 2024

  • Tags

    Work Management

View Project

PORT OF BRINDISI WESTERN BASIN

Emergency Safety Plan and depollution of the Western Basin of the Port of Brindisi

  • Strategy

    Site Supervision

  • Design

    Work Management

  • Client

    Autorità Portuale di Brindisi

  • Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 7,341,144.99

  • Completion Date

    December 13th 2007 - April 30th, 2011

  • Tags

    Work Management

View Project

PORT OF TARANTO NEW BREAKWATER

The project has involved the construction of a new breakwater for the protection of the Taranto port harbor, west side, of a length of…

  • Strategy

    Geological and geognostical surveys and lab analyses

  • Design

    Design,

  • Client

    T.C.T. spa Livorno

  • Chief Project Manager and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 17,980,000.00

  • Completion Date

    October 3, 2012 - March 8, 2013

  • Associated consultants

    Assignment in partnership with E&G s.r.l. Rome – Geol. Aldot Teodoro Battaglia

  • Tags

    Design

View Project
May 11, 2019

UFFICI E AMBULATORI INAIL TARANTO

The project concerns the refurbishment of a building of great architectural value, which has been disused for several years, to become the new headquarters…

  • Strategy

    Feasibility study

  • Design

    Design, Project Management

  • Client

    Istituto di Diagnosi e Terapia s.r.l.

  • Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 6.000.000,00

  • Completion Date

    May 11th, 2019 - January 1st, 2020

  • Tags

    Design, Project Management

View Project

PORT OF CIVITAVECCHIA DARSENA ENERGETICA GRANDI MASSE

The project has provided, at the beginning, seabed dredging in order to allow the correct maneuvering of vessels both during access and berthing phases.

  • Strategy

    Detail design, Safety Coordination during design phase

  • Design

    Project Management, Design

  • Client

    Compagnia Porto di Civitavecchia s.p.a., Roma (Italy)

  • Team Leader and Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 235,261,195.07

  • Completion Date

    August 1st, 2008 - March 9th, 2009

  • Tags

    Design, Project Management

View Project

TORVALDALIGA NORD TERMAL POWER PLANT ENEL CIVITAVECCHIA

The The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m. The construction solution of…

  • Strategy

    Site Supervision

  • Design

    Project Management, Work Management

  • Client

    ENEL Ingegneria e Innovazione SPA, Milano

  • Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 54,545,000.00

  • Completion Date

    June 20th, 2006 - January 31st, 2010

  • Tags

    Project Management, Work Management

View Project

TORVALDALIGA NORD TERMAL POWER PLANT ENEL CIVITAVECCHIA: COASTAL FILL “LA MATTONARA”

The project foresees the completion of the ‘Banchina di Ponente lato Nord’, for a total length of 385,50 m. The construction solution of the…

  • Strategy

    Preliminary Design, Final Design, Coordination and Site Supervision and Safety Coordination during the works phase.

  • Design

    Project Management, Design

  • Client

    Compagnia Porto di Civitavecchia spa ENEL Ingegneria e Innovazione SPA, Milano "

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 10,200,000.00

  • Completion Date

    June 1st, 2009 - September 1st, 2009

  • Tags

    Project Management

View Project

PORT OF TARANTO MOORING QUAY “CALATA V”

Port of Taranto, Italy COMPLETION OF THE RENOVATION WORKS OF THE MOORING QUAY “CALATA V”

  • Strategy

    For construction design, Safety Coordination during design Phase

  • Design

    Infrastructure and maritime works, Design

  • Client

    Autorità di Sistema Portuale del Mar Ionio - Porto di Taranto

  • Chief Project Manager and HSE Manager

    Ing. Michelangelo Lentini

  • Budget

    € 1,144,402.21

  • Completion Date

    April 6th, 2023 - October 9th, 2023

  • Tags

    Design

View Project

PORT OF BANGKOK LAEM CHABANG THAILAND

The project has included the realization of a Logistics Park in Bangkok Free Trade Zone, in two different layouts.

  • Strategy

    Feasibility Study

  • Design

    Design

  • Client

    THAI Maritime Navigation Co., Ltd. - Bangkok

  • Team Leader, Chief Project Manager

    Ing. Michelangelo Lentini

  • Budget

    € 59,285,000.00

  • Completion Date

    April 20th, 2007 - May 31st, 2007

  • Tags

    Design

View Project
September 1, 1993

NEW PREMISES OF THE COURT OF FIRST INSTANCE, COURT OF APPEAL AND COURT OF JUSTICE

New Premises of the Court of First Instance, Court of Appeal and Court of Justice of Lecce, Taranto Branch, located in the Paolo VI…

  • Strategy

    Preliminary design, Detail design, For Construction design, Site Supervision

  • Design

    Design, work management

  • Client

    Provincia di Taranto - Via Anfiteatro n. 4 - 74100 Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 11,477,614.52

  • Completion Date

    Septemberr 1st, 1993 - October 30th, 2003

  • Tags

    Design, Work Management

View Project

PORT OF COSTANZA, ROMANIA

The Romanian coast along the Black Sea is subject to erosion processes that not only cause the loss of particularly valuable land but also…

  • Strategy

    Design review & Audit, Site Supervision Services

  • Design

    Work Management

  • Client

    Administratia Bazinala de Apa Dobrogea Litoral Romania

  • Engineer

    Ing. Michelangelo Lentini

  • Associated Consultants

    Development in partnership with EPMC

  • Budget

    € 30.213.935,21

  • Completion Date

    December 3rd, 2019 - ongoing

  • Tags

    Work Management

View Project

PORT OF TARANTO SEABED DEEPENING OF THE ACCESS CHANNEL TO THE MOLO POLISETTORIALE

Once that the preliminary bathymetric investigation was completed, a systematic and a detailed bathymetric survey were carried out, along with several stratigraphic analyses of…

  • Strategy

    Preliminary design, Detail design, For construction design, Site Supervision

  • Design

    Epc Activities, Design

  • Client

    T.C.T. spa - Molo Polisettoriale - 74100 Taranto

  • Chief Project Manager and Site Supervisor

    Ing. Michelangelo Lentini

  • Budget

    € 3,601,000.00

  • Completion Date

    March 1st, 2005 - September 21st, 2005

  • Tags

    Design, EPC Activities

View Project